CONTRACT LAW OF THE PEOPLE'S REPUBLIC OF CHINA 
(Adopted and Promulgated by the Second Session of the Ninth National People's 

Specific Provisions

Chapter Sixteen Contracts for Construction Projects
Article 269 Definition of Contract for Construction Project
A contract for construction project is a contract whereby the contractor performs project construction, and the developer pays the price.
Contracts for construction projects include contracts for survey, design, and construction. 

Article 270 Writing Requirement
A contract for construction project shall be in writing. 

Article 271 Tendering Process in Construction Project
Tendering for a construction project shall be conducted in an open, fair and impartial manner in accordance with the relevant laws. 

Article 272 Contracting and Subcontracting in Construction Projects
The developer may enter into a contract for construction project with a prime contractor, or enter into contracts for survey, design, and construction with the surveyor, designer, and constructor respectively. The developer may not divide a construction project which should be completed by one contractor into several parts and contract them out to several contractors.
Subject to consent by the developer, the prime contractor or the contractor for survey, design, or construction may delegate part of the contracted work to a third person. The third person and the prime contractor or the contractor for survey, design, or construction shall be jointly and severally liable to the developer in respect of the work product completed by such third person. The contractor may not assign in whole to any third person the contracted construction project, or divide the whole contracted construction project into several parts and separately assign each part to a third person under the guise of sub-contracting.
The contractor is prohibited from sub-contracting any part of the project to an entity not appropriately qualified. A sub-contractor is prohibited from further sub-contracting its contracted work. The main structure of the construction project must be constructed by the contractor itself. 

Article 273 Major State Construction Projects
A contract for a major state construction project shall be concluded in accordance with the procedure prescribed by the state and in compliance with the state-approved documents such as the investment plan and feasibility studies report, etc. 

Article 274 Terms of Contract for Survey or Design
A contract for survey or design includes terms such as the time limit for submission of the relevant basic information and documents (including budget estimate), the quality requirements, fees, and other conditions of cooperation, etc. 

Article 275 Terms of Construction Contract
A construction contract includes terms such as the scope of the project, the construction period, the time for commencement and completion of any work to be commissioned in the interim, the quality of the project, the cost of the project, the time for delivery of technical materials, the responsibilities for the supply of materials and equipment, the appropriation of funds and settlement of account, inspection upon completion of the project, the scope and period of quality warranty, and cooperation between the parties, etc. 

Article 276 Supervision of Construction Project
Where the construction project is subject to supervision, the developer shall enter into an agency appointment contract for project supervision with a project supervisor in writing. The rights, obligations and associated legal liabilities of the developer and supervisor shall be prescribed in accordance with the provisions hereof concerning agency appointment contracts and the provisions of other relevant laws and administrative regulations. 

Article 277 Developer's Right to Inspect
Provided that the developer does not interfere with the normal operation of the contractor, it may inspect the progress and quality of the work at any time. 

Article 278 Concealed Work
In the case of concealed work, the contractor shall give the developer notice for inspection prior to concealment. Where the developer fails to timely conduct inspection, the contractor may extend the relevant project milestones, and is entitled to claim damages for work stoppage or work slowdown, etc. 

Article 279 Inspection of Completed Project; No Use Prior to Inspection
Upon completion of the construction project, the developer shall conduct acceptance inspection according to the construction drawings and specifications, and in accordan
分享到:
阅读上文 >> 中华人民共和国合同法(英文)-Supplementary Provisions
阅读下文 >> 中华人民共和国合同法(英文)- Specific Provisions Chapter 9-15

大家喜欢看的

  • 品牌
  • 资讯
  • 展会
  • 视频
  • 图片
  • 供应
  • 求购
  • 商城

版权与免责声明:

凡注明稿件来源的内容均为转载稿或由企业用户注册发布,本网转载出于传递更多信息的目的;如转载稿涉及版权问题,请作者联系我们,同时对于用户评论等信息,本网并不意味着赞同其观点或证实其内容的真实性;


本文地址:http://news.ceoie.com/show-59653.html

转载本站原创文章请注明来源:中贸商网-贸易商务资源网

微信“扫一扫”
即可分享此文章

友情链接

服务热线:0311-89210691 ICP备案号:冀ICP备2023002840号-2